Projects
We progress together
Discover how we work for personal and business progress in the real world, with our clients and collaborators.
Building a 12,000 m² Industrial Complex
Executive Project and Installations, Construction Management, and Urban Development Implementation of the New Industrial Complex of Iberspa, S.L. in Cervera.
Comprehensive Project: modern, secure, and sustainable offices
Executive project and construction management of the new 1,500 m² offices in Torà. Engineering projects for the updating of industrial safety facilities and licenses. Project and management of the removal of asbestos roofing and installation of new roofing.
Building a biological plant in Segrià that transforms waste into sustainable resources.
Construction of a biological plant to treat the pig waste from a farm located in Segrià.
Constructing a biological treatment plant.
Construction of a biological plant to treat pig waste from a farm located in Segrià.
Contributing to the Sustainable Expansion of Thermoformed Sheet Manufacturing Facilities in Sant Celoni.
We have carried out the project for Substantial Modification and Environmental Impact Study for the expansion of the thermoformed sheet manufacturing facilities located in Sant Celoni.
Analyzing Sustainability in the Metallurgical Sector.
Life Cycle Analysis of various products from a metallurgical company.
Life Cycle Analysis for the Comparison of Two Types of Packaging in the Pharmaceutical Industry, for Their Replacement in the International Market.
We have assisted the company in improving innovation and eco-design, with the aim of determining their environmental impacts.
We contribute to the sustainable modernization of the controlled special waste landfill in Castellolí
We have carried out the project for Substantial Modification and Environmental Impact Study of the modification of the controlled special waste landfill located in Castellolí.
Towards More Efficient Waste Management in Pont de Vilomara
We have made a substantial modification with an Environmental Impact Study of the Environmental Authorization for the expansion of the waste treatment facilities located in Pont de Vilomara, to update the data of the productive activity of fridge treatment and other refrigeration equipment.
Assisting Our Clients in Their Commitment to a More Sustainable Future: Life Cycle Analysis.
We have conducted the Life Cycle Analysis using GABI software for 8 product references from the civil engineering division and certification of the Environmental Product Declaration (EPD) by the International EPD® System.
Implementing an Agri-food Industry in Sant Salvador de Guardiola: An Integral and Sustainable Solution
Executive project for the removal of asbestos, installation of a new roof, photovoltaic installation, and implementation of a new agri-food industry in Sant Salvador de Guardiola. Urban Planning.
Optimizing Water Consumption in a Paper Industry.
Medium and Low Voltage Project in the Paper Industry.